A commercial re-roof is a capital project with a long life and a large cost, and its success depends on the specification, the installer, and the oversight, not just the membrane. Orlando Roofing Crew connects Orlando owners and managers with licensed commercial crews who bid on a written scope and manage permits, inspections, and warranty documentation.

Written SpecificationsPermitted & InspectedWarranty Documentation
Choosing a Roof

Commercial Roof Systems for Central Florida Buildings

The right system depends on the building, the budget, and how long you will own it.

Commercial roof systems
SystemHow it worksStrengthsConsiderations
TPOSingle-ply thermoplastic membrane, mechanically attached, adhered, or ballasted; seams heat-weldedReflective, widely used, seams weldedQuality varies by manufacturer; installer skill matters
PVCSingle-ply thermoplastic with heat-welded seamsChemical resistance, strong seams, reflectiveGenerally costs more than TPO
EPDMRubber single-ply, adhered or ballastedLong track record, flexibleSeams and flashings rely on adhesives; usually black
Modified bitumenAsphalt-based sheets, torch, adhered, or self-adhered, often in pliesDurable, multi-layer redundancyTorch application has fire risk; weight
Built-up roofing (BUR)Layers of felt and asphalt with surfacingRedundant layers, long historyLabor-intensive; hot asphalt handling
MetalStanding seam or screw-down panelsLong life, wind resistance when installed to approvalHigher cost; thermal movement; sealed laps
Spray polyurethane foamSprayed insulation and waterproofing with protective coatingSeamless, insulatingNeeds recoating; applicator skill is critical
Before the Bids

Writing a Specification So Bids Compare

If every bidder prices a different roof, you cannot compare the numbers.

A specification, or scope of work, describes what is to be installed so that bidders price the same job. For a simple building it may be a few pages, and for a complex one it may be drawn up by a roof consultant or architect. At minimum it should cover the existing roof's removal or retention, deck repair, insulation thickness and R-value, membrane type and thickness, attachment method and wind uplift requirements, flashing details, drainage and slope, accessories, warranty requirements, and permit and inspection responsibilities.

  • Tear-off versus recover, and disposal
  • Deck inspection and repair allowance, with unit prices
  • Insulation type and thickness, including tapered insulation for drainage
  • Membrane type, thickness, and manufacturer
  • Attachment method and the wind uplift rating required
  • Flashing, edge metal, and penetration details
  • Warranty type and term required
  • Cleanup, protection of tenants and property, and schedule
Florida Requirements

Permits, Product Approvals, and Inspections

A commercial re-roof in Florida is a permitted, inspected project.

Roofing products used in Florida need a Florida product approval, and the roof must be installed to the approval and to the Florida Building Code, which includes high-wind provisions that are significant in hurricane-prone regions. Your contractor pulls the permit with the building department that has jurisdiction. In the City of Orlando, that process includes a dry-in or in-progress inspection for residential and commercial re-roofs, and a final inspection that requires an affidavit verifying roof deck nailing and secondary water barrier. Larger projects also involve a recorded Notice of Commencement, which the contractor handles.

The 9th edition of the Florida Building Code takes effect December 31, 2026, and revises the reroofing provisions, including when tear-off is required for water-soaked or deteriorated roofs. Ask which edition governs your permit date. Orange County, Seminole County, and individual cities each have their own offices; see the service areas page.

Sources & Verification

Facts on this page were checked against the sources below in October 2026. Laws, codes, and program rules change, so confirm current details with the agency before you rely on them.

The Florida Question

Wind Uplift, Edge Metal, and Why Roof Edges Fail First

In high winds, roofs often fail at the perimeter and corners.

Wind creates the greatest uplift at roof corners and edges, and wind damage frequently starts there. The edge metal and perimeter attachment are therefore critical: the membrane must be secured more heavily in the perimeter and corner zones, and the edge metal must be rated and fastened to resist the loads. Specifications should state the required wind uplift performance, and the attachment pattern must match the product approval and the building's design pressures.

For owners, the lesson is that the wind rating is a system rating, not a membrane label. Ask the contractor to show how the proposed assembly, including insulation, fasteners, adhesive, membrane, and edge metal, meets the required rating, and keep the documentation. See TPO vs EPDM vs modified bitumen for Florida commercial flat roofs for membrane trade-offs.

The Big Decision

Tear-Off, Recover, and What Lies Beneath

Whether to remove the old roof is a technical and financial decision.

Tear-off and recover
ApproachAdvantagesLimits
Full tear-offReveals and allows repair of the deck; removes wet insulation; resets the roof's lifeHighest cost and disruption; disposal
Recover (over existing)Lower cost and disruption; keeps the existing roof as a baseOnly if the existing roof is dry and sound and codes allow; adds weight; hides problems
Partial tear-offRemoves wet or damaged areas; recovers the restNeeds a moisture survey; complex transitions

A moisture survey and test cuts before the decision tell you what you are covering. Recovering over wet insulation is one of the most common and costly mistakes in commercial roofing.

Comparing Proposals

Reading Bids, Contracts, and Change Orders

The lowest bid is often the one that left something out.

  • Compare scope line by line against your specification
  • Check that the bid names the manufacturer, product, and warranty
  • Look at unit prices for deck repair and extra insulation
  • Check payment terms: progress payments tied to completed work, not large deposits
  • Verify the contractor's Florida license, insurance, and references
  • Ask about subcontractors and who supervises the work
  • Understand how change orders are priced and approved
  • Confirm schedule, protection of tenants, and weather provisions

Under section 489.126, a contractor receiving more than a 10% initial payment on residential work must apply for permits within 30 days and start work within 90 days, and section 489.1425 requires a Homeowners' Construction Recovery Fund notice on residential contracts over $2,500. Those residential rules do not govern commercial contracts directly, but they show what reasonable payment and start terms look like, and a commercial contract should have clear terms of its own.

Sources & Verification

Facts on this page were checked against the sources below in October 2026. Laws, codes, and program rules change, so confirm current details with the agency before you rely on them.

What You Get on Paper

Commercial Roof Warranties: Material, Workmanship, and Manufacturer

Warranties come in layers, and each has limits.

Commercial roof warranties
TypeWhat it coversCommon limits
Manufacturer material warrantyDefects in the membrane and sometimes accessoriesExcludes workmanship, ponding, and damage from traffic
Manufacturer system warrantyThe membrane system installed by an approved contractor, sometimes including labor for leaksRequires approved installer, inspections, and maintenance
Contractor workmanship warrantyInstallation defects for a stated number of yearsOnly as good as the contractor's staying power
Wind speed or NDL warrantyDamage from wind up to a stated speedSpecific conditions, exclusions, and proof of maintenance

Read the terms before signing. Ask what voids the warranty, who may repair the roof, how claims are filed, and whether the warranty transfers when the building is sold. See commercial roofing for more on warranty considerations.

From Bid to Warranty

How a Commercial Re-Roof Project Runs

Timing depends on size, system, weather, and tenant constraints.

Assessment and Specification

Condition survey, moisture survey, and specification or scope of work.

1
2

Bids and Selection

Itemized bids compared, references checked, contract negotiated.

Permit and Submittals

Permit pulled, product approvals and submittals reviewed, materials ordered.

3
4

Mobilization and Tear-Off

Tenant protection, staging, and removal of existing roofing as specified.

Deck Repair and Insulation

Deck repaired, insulation installed to the specified thickness and slope.

5
6

Membrane and Flashing

Membrane installed, seams welded or adhered, flashings and edge metal completed.

Inspections and Closeout

Required inspections, manufacturer inspection if applicable, punch list, and warranty issued.

7
Living Through It

Working Around Tenants and Operations

A re-roof of an occupied building is a logistics project.

Noise, dust, debris, odors from adhesives, and safety hazards affect occupants and customers. A good contractor plans staging, loading areas, protection of walkways and entries, and the sequence of work to minimize interruption. For sensitive occupants such as medical offices, restaurants, and retail, ask about work hours, noise limits, HVAC intake protection, and communication with tenants. Weather is a factor as well: crews must dry in each day's work, and the plan must cover sudden storms.

  • Agree on work hours, staging, and loading areas
  • Protect air intakes and entrances
  • Notify tenants of schedule and hazards
  • Plan daily dry-in and weather contingencies
  • Name a single point of contact for the project
What Drives the Number

What Drives Commercial Roof Replacement Cost

No honest figure exists without a roof, a specification, and a bid.

  • Roof area, height, and access
  • System chosen, membrane thickness, and manufacturer
  • Insulation requirements, including tapered insulation
  • Deck condition and repair allowance
  • Number of penetrations, curbs, and equipment to be flashed
  • Edge metal, drainage changes, and code upgrades
  • Tenant constraints and working hours
  • Warranty tier and inspection requirements

Ask for bids on a common specification and for unit prices on uncertain items, so that surprises have a price before they happen. See financing options for ways to fund a capital project.

Beyond the Membrane

Insulation, Slope, and Energy Considerations

A re-roof is the cheapest time to fix insulation and drainage.

Insulation is part of most low-slope roof assemblies, and a re-roof is the moment to bring it up to current energy-code requirements, to correct wet or compressed insulation, and to add tapered insulation to improve drainage. Tapered insulation creates slope on a roof that ponds, directing water to drains. The insulation's thickness and type also affect wind uplift performance and fire classification, so it must be chosen as part of the system, and be approved with the membrane. Ask what R-value the assembly will achieve and what code requires for your building.

  • Verify the insulation type and R-value against the energy code
  • Ask about tapered insulation if ponding is an issue
  • Make sure insulation is approved with the membrane for the wind rating
  • Confirm that wet insulation is removed, not covered
Water Has to Go Somewhere

Drainage Design on a Re-Roof

Good drainage is designed, not hoped for.

The roof must shed water to drains, scuppers, or gutters, and the number and position of those drains matter. A re-roof is the opportunity to add drains, correct low spots, and install overflow scuppers. Poor drainage was a common reason for premature failure of the old roof, so replacing the membrane without addressing it repeats the problem. Ask the contractor to review drainage and to show how water will leave the roof after the work.

Checking the Work

How Quality Is Checked During Installation

Most roof defects are covered up by the next layer.

  • Deck inspection and repair before insulation
  • Insulation attachment and joint staggering
  • Membrane seam welds or adhesion tested with probing and test cuts
  • Flashings and terminations inspected at each detail
  • Edge metal and perimeter attachment checked against the specification
  • Daily dry-in and weather protection
  • Photographs of each stage, with dates
  • Manufacturer's inspection for system warranties
  • Building department inspections at the required stages

For larger projects, consider independent inspection or a roof consultant who observes the work and reports to you, not to the contractor.

Finishing Properly

Closeout: What You Should Have at the End

The paperwork is part of the product.

  • Final inspection approval and permit closeout
  • Warranty documents, with registration where required
  • Product approvals and technical data sheets
  • As-built details and roof plan
  • Photographs of each installation stage
  • Maintenance requirements and the inspection schedule
  • Contacts for the contractor and manufacturer
  • Lien releases and final payment documentation

Put all of it in the roof file. Do not make final payment until the punch list is complete and the paperwork is delivered.

On the Site

Site Safety, Staging, and Logistics

A commercial re-roof is a construction site above your tenants.

The contractor is responsible for fall protection, safe access, protection of workers and the public, and handling of materials, including hot asphalt or torches where used. Property managers should ask about the contractor's safety program, certificates of insurance, and their plan for staging materials and equipment, protecting entrances and parking, and handling debris. Tear-off debris falling is a particular hazard to occupants and passers-by, so the plan should include debris chutes or controlled removal and protected pathways.

Choosing a Contractor

How to Choose a Commercial Roofing Contractor

Good Signs

  • Active Florida license and insurance, verified
  • Experience with your roof system and building type
  • Manufacturer approval to install and warrant the system
  • References from similar projects
  • Written specification, schedule, and warranty

Warning Signs

  • A price far below all others
  • No permit or product approval mentioned
  • Large deposit requested
  • Refusal to provide references or insurance
  • Vague description of the roof assembly
Quick Reference

Where to Go Next

Not sure if replacement is neededCommercial Roof Inspection →
Considering a coatingCommercial Roof Coating →
Flat roof detailsFlat Roofing →
Ongoing care after installCommercial Roof Maintenance →
Where We Work

Orlando & Central Florida

Commercial roofing crews serve the Orlando area, including the office corridors and retail centers in each community.

Common Questions

Commercial Installation FAQs

It depends on size, system, weather, and tenant constraints. The contractor should give a schedule in writing.

Yes. The contractor pulls it, and inspections are required.

It depends on the building and budget. TPO, PVC, EPDM, modified bitumen, BUR, metal, and spray foam each have strengths.

Depends on its condition. A moisture survey and test cuts decide.

Manufacturer and contractor warranties of various types. Read the terms.

Write a specification and compare scope line by line.

Usually, with planning.

It depends on the roof, system, and scope. A written bid on a specification gives the real number.

Plan the Project

Request a Commercial Re-Roof Bid

A free assessment and a written bid on a clear scope.

Emergency & Routine Dispatch
(689) 359-5257

Orlando Roofing Crew connects property owners with vetted, independently licensed and insured Florida roofing contractors. Inspections, repairs, and workmanship warranties are provided directly by the independent licensed contractor assigned to your property.

Request a Free Inspection

A local specialist inspects your roof and gives you a written scope. No obligation.